About Company

Welcome to Rana Engineer Co.

For over last two and a half decades we are into business of erection, leveling and alignment of POY, PFY and FDY Spg.machine. We also do D.T/Texturising machine & dismantling assembling and Re-erection of the same .We are also doing S.S. & C.S. Piping work including Jacketed Piping & Dowtherm Piping with 100% radiography X-ray joints.

We have successfully repeated the yearly plant maintenance contract and we have completed the major shut down jobs in refinery, chemical plant and completed installation of Batch Poly, C.P. plant, Film Plant and Power plants. We are also specialized in fabrication and erection of chips silos, vessels and chimneys.

We have also completed all type of AHU plants (Indian and imported) like China, Luwa etc, with all related piping and steel structure work.

We have qualified Engineers, Site In charge, Site supervisor, Foreman, M.W. Fitters, Fabricators, Fitters, TIG Welders & skilled riggers, khalashi to handle site conditions & carry out the jobs most satisfactorily.

A part from the permanent staff of over 580 we have a regular causal Labor supply to the tune of 250 and any number of labors can be arranged depending on site requirement.

Our Vision

Rana Engineering shall be professionally managed Project Execution, Shutdown & Routine Maintenance Services Provider Committed to total Customer satisfaction and Nation building. It shall be innovative, entrepreneurial, customer focused and competent team constantly creating value and attaining global benchmarks. It shall institutionalise the culture of caring, trust and continual improvements while meeting employees, customers and national needs.

Certificate

Plant & Machinery

Processing tools, Vernier Caliper, Micrometer(Different Sizes) with all equipped Tool Box. 120 sets.
Master Level, Straight Edge, Therolite Set 62 sets.
Welding Rectifiers 290 nos.
Welding Generator With Argon Sets 158 nos.
Pug Cutting Machine 48 nos.
Grinding Machine 248 nos.
Gas Cutting Sets 150 nos.
Plazma Cutting Machine 8 nos.
Drill Machine Magnetic / Normal 44 nos.
Pipe Bending Machine 18 nos.
Press For Straightening / Jim Screwed 18 nos.
Chain Pulley Block(10 Ton Cap Hoist) (05 Ton Cap Hoist) (3/2 Ton Cap Hoist) 30 nos, 50nos, 78 nos.
Winch Motorized(25 Ton Cap Hoist) Winch Manual (20/10 Ton Cap) 08 nos. 16 nos.
Motorized Plate Rolling Machine Bending Up to 2.5Mtr. Length & Up to 40mm thick 04 nos.
Derrick (80/60 Mtr. Length) 14 nos.
All types of other tools & tackles complete set. 350 nos.
Forklift(10to Capacity) (Ston Capacity) 7 nos. 5 nos.
Hydra Crain (14 Ton Capacity). 9 nos.
Crane (50 Ton Capacity) (100 Ton Capacity) (150 Ton Capacity) 3 nos. 2 nos. 1 nos.
Pallet Truck (2.5 Ton Capacity) 58 nos.
Staff Van / Jeep 5 nos.
Loading Truck / Trailer 07 nos.
And all other related tool & tackles are available as per site requirement.

Key Strength

  • Welding Machines
  • Plate bending Machine
  • Grinding Machines
  • Other Tool & Tackles Etc…
  • Plasma Cutters
  • Pipe bending equipment
  • Air compressors
  • Hydraulic jacks
  • Core Cutters
  • Drilling Machines
  • Threading Machine
  • Scaffolding Materials
  • Various inspection instruments
  • Induction heaters
  • Hydra & Crane
  • & Other related P&M

Quality Policy

We at Rana Engineering co. are committed to satisfy our customers by providing consistent quality of Manufacturing, Project Execution, Shutdown, Routine Maintenance and providing human resources at a fair price.

We shall try to achieve continually improve the effectiveness of the quality management system through PDCA (Plan-do-check-act) cycle and involvement of employee.

HEALTH, SAFETY & ENVIRONMENT POLICY

We are engaged in Project Execution, Shutdown & Routine Maintenance related solutions to the industry.

To achieve this we are committed to:

Establish, Review, Maintain and continually improve our HSE management systems, in particular objectives and adoption of best operational control practices & performance at our sites.

Prevent adverse environmental impacts & occupational health and safety risks.

Ensure that HSE requirements are integrated in all management processes including product Realization and Enabling processes.

Comply with all applicable Legal / Regulatory and Other requirements as, subscribed/related to our activities.

Strengthen HSE Awareness, Training and Competency of all employees while seeking their active co-operation.

Optimize consumption of resources in particular water, power and oil. Also minimize/eliminate the use of hazardous materials.

Empowering our employees to immediately stop the work, in case of unsafe condition or unsafe act, that may cause imminent danger to life, health and environment.

We shall communicate this policy to all persons working for or on behalf of the organization and make it available to all stake holders.